BINDER MKF 240
BINDER ·Made in Germany · In Active Production

BINDER MKF 240

BINDER MKF 240 — Climate chambers with Temperature -40…180 °C.

The MKF 240 is a 228 L alternating climate chamber with a working range of -40…180 °C and 10…98 % RH, built for rapid temperature cycling (5 K/min heating, 120 min from 180 °C to -40 °C). It is the mid-size 400 V model in the MKF series, distinguished from the CO₂ variants by its standard humidity system and from smaller siblings by its 30 kg-per-rack load capacity.

Temperature
-40…180 °C

BINDER MKF Series — Model Comparison & Selection

Model Temperature, °CHeight, cmInterior volume, LLoad per rack, kgMax heat compensation, WNominal power, kW
MKF 240 Current -40–180171.5228304006.8
MKF 1020 -40–180200.599140150012.5
MKF 1020 CO₂ -48–180200.599140140011.5
MKF 115 -40–180172.5115304004.8
MKF 240 CO₂ -50...180171.3228309006.8
MKF 400 -40–180171417308008
MKF 400 CO₂ -50...180172.74173016007.9
MKF 56 -40–180144.560152502.8
MKF 720 -40–180200.573440100011
MKF 720 CO₂ -48–180200.573440110011

Full specifications

Core Performance & Functional Specifications
Temperature -40...180 °C
Interior volume 228 L (MKF240-400V, 50 Hz)
Load per rack 30 kg (MKF240-400V, 50 Hz)
Maximum heat compensation 400 W
Nominal power 6.8 kW (MKF240-400V, 50 Hz)
Article Number mfr 9020
Dimensions, Weight & Mechanical Design
Height 1715 mm (MKF240-400V, 50 Hz)
Width 1115 mm (MKF240-400V, 50 Hz)
Electrical, Power & Drive Specifications
Power frequency 50 Hz (MKF240-400V)
Rated voltage 400 V
Unit fuse 16.0 A (MKF240-400V, 50 Hz)
Operating Conditions, Environment & Protection
Humidity range 10...98 % RH
Cooling down time from 180°C to -40°C mfr 120 min
Humidity fluctuation with humidity dependent on set value mfr 2.5 % r.F.
Standards, Safety & General Data
Average heating-up rate according to IEC 60068-3-5 between -40°C and 180°C mfr 5.0 K/min

Description

Construction and series positioning

Behavior under load and in different media

Installation, connection and control

Integration & Operating Notes

Electrical
400 V 3 N/PE supply with 16 A fusing is mandatory

The chamber draws 6.8 kW nominal at 400 V 3 N/PE 50 Hz and requires a 16.0 A unit fuse. Verify that the site supply and upstream protection match these values before connection; the -C variant is required for 480 V 60 Hz networks.

Data Sheet Model MKF 240 en.pdf; Factory Specification Sheet
Mounting
Rear power switch must be accessible after installation

From size 115 on, the chamber has a rear power switch in addition to the main power switch. Both must be on for commissioning and troubleshooting, so leave sufficient clearance behind the unit for access.

Operating Manual MKF/MKFT (E5) 10/2026, p.24-25, p.135
Process Limits
Humidity control narrows the usable temperature range

With humidity active, the temperature range is limited to 10…95 °C and temperature fluctuation increases to 0.1…1.3 K. Plan test profiles that require humidity within this band; outside it, only dry operation is possible.

Factory Specification Sheet
Process Limits
Heat compensation limited to 400 W from the load

The maximum heat compensation is 400 W. Exceeding this load dissipation can prevent the chamber from holding setpoint. Calculate the total power dissipated by test specimens and keep it below this limit.

Factory Specification Sheet
Maintenance
Annual maintenance and leak test are required

Regular maintenance at least once a year and a leak test per Regulation (EU) 517/2014 are mandatory. Schedule these and document them in the service log book; also plan humidifier maintenance annually, depending on water quality.

Operating Manual MKF/MKFT (E5) 10/2026, p.134
Maintenance
Service message appears at 8760 hours or two years

After 8760 operating hours or two years, a service message appears; after confirmation it reappears every two weeks until reset by BINDER Service. Plan a BINDER Service intervention to reset it and avoid repeated alarms.

Operating Manual MKF/MKFT (E5) 10/2026, p.135
Cooling & Media
Water quality and supply must be suitable for humidification

The humidification system uses freshwater and wastewater paths. Water quality affects humidifier maintenance intervals; verify that the site water supply meets the chamber's requirements and that wastewater drainage is available.

Operating Manual MKF/MKFT (E5) 10/2026, p.134
Control & I/O
Zero-voltage switching outputs can signal external equipment

The controller provides zero-voltage switching outputs for external switching or signaling. Use these to interlock ancillary devices or alarms; they do not supply power, so an external relay or contactor is required.

Operating Manual MKF/MKFT (E5) 10/2026, section 'Zero-voltage switching outputs'

Selection & Integration Q&A

When should I choose the MKF 240 instead of the MKF 240 CO₂ or the MKF 115?

Choose the MKF 240 for standard alternating climate testing from -40 to 180 °C with humidity; the CO₂ variant extends the low end to -50 °C. The MKF 115 offers less interior volume (115 L) and lower load capacity, so select the 240 when 228 L and 30 kg per rack are needed.

What maintenance is required and what accessories are not included in the base delivery?

Annual maintenance and a leak test per EU 517/2014 are mandatory; humidifier maintenance is annual, and condensers should be cleaned every 1–2 years. Options not included: water cooling, compressed air dryer, RS485 interface, analog outputs, Pt 100 sensor, APT-COM™ software, and external freshwater/wastewater cans (MKF 56 only).

Can the MKF 240 be installed in a dusty environment, and what are the duty-cycle limits?

In dusty ambient air, check the condenser fan grid behind the left maintenance access flap weekly and clean by suction after disconnecting the chamber. The chamber is not rated for continuous condensing operation; defrosting cycles are required during refrigerating operation.

Dimensional Drawings & Technical Documentation

Dimensional drawings

MKF 240 — drawing 1

Click drawing to inspect vector dimensions

Technical documentation

PDF
Data Sheet Model MKF 240 en
Datasheet ·1,1 МБ ·10 pp.
View PDF
PDF
MKF+MKFT (E5) 10 2026 en
Manual ·18,1 МБ ·179 pp.
View PDF