Elmo Rietschle 2BV5121
Elmo Rietschle ·Made in Germany · In Active Production

Elmo Rietschle 2BV5121

Elmo Rietschle 2BV5121 — Liquid Ring Vacuum Pumps with Motor power 11 kW, Pumping speed 40 m³/h.

The 2BV5121 is a liquid-ring compressor in the L-BV5 series, built with a cast-iron casing and bronze or CrNi steel impeller, available in IE3 efficiency. It delivers 40 m³/h at 50 Hz and 45 m³/h at 60 Hz with an 11 kW motor, positioning it between the 7.5 kW 2BV5111 and the 15 kW 2BV5131. It is used for handling gases and vapours in vacuum or compressor duty where a liquid ring provides robust, oil-free operation.

Motor power
11 kW
Pumping speed
40 m³/h

Elmo Rietschle L-BV5 Series — Model Comparison & Selection

Model Motor power, kWOperating principleNoise level, dBPower supplyPumping speed, m³/hWeight, kg
2BV5121 Current 11Liquid ring compressor70AC40—
2BV5110 5.5ring blow67AC—67
2BV5111 7.5Liquid ring723~ AC—124
2BV5131 15Liquid ring74AC17.4178
2BV5161 15Liquid ring74AC500160
L-BV5 2060 ——————

Full specifications

Core Performance & Functional Specifications
Motor power 11.0 kW (50 Hz)
60 Hz: 11.0 kW
Operating principle Liquid ring compressor
Pumping speed 40.0 m³/h (50 Hz)
60 Hz: 45.0 m³/h
Electrical, Power & Drive Specifications
Power supply AC (3~ 50/60 Hz)
Operating Conditions, Environment & Protection
Noise level 70 dB(A) (50 Hz)
60 Hz: 75 dB(A)
Protection rating IP55

Description

Construction and series positioning

Behavior under load and media

Installation, connection and operation

Integration & Operating Notes

Mounting
Maintain 53 mm clearance around fan guard

Insufficient clearance will cause overheating and reduced motor life. The 2BV5121 requires at least 53 mm free space around the fan guard for heat dissipation, as specified in the technical data. Ensure the installation location allows unobstructed airflow and does not exceed the maximum ambient temperature of +40 °C.

Operating Instructions — L-BV2, Technical data, page 8
Process Limits
Keep gas/vapour temperature below 80 °C or boost liquid flow

The maximum permissible gas/vapour temperature is +80 °C. For higher temperatures, increase the operating-liquid flow to 2× the design flow for 2BV5… types or install a pre-condenser. Also provide guards against burns if surface temperatures exceed safe limits. Exceeding this limit without mitigation can damage the liquid ring and seals.

Operating Instructions — L-BV2, Technical data, page 10
Electrical
Verify motor insulation resistance before commissioning

Measure insulation resistance of the motor windings. If the resistance is ≤1 kΩ per volt of measurement potential, dry the windings before connecting power. Failure to do so may result in motor failure due to moisture ingress during storage or installation. This check is mandatory per the commissioning section.

Operating Instructions — L-BV2, Commissioning, page 20
Control & I/O
ATEX: independent monitoring for liquid feed and level

For ATEX variants, monitoring systems for operating-liquid feed and liquid level must be fully functional independently of each other, even when using computer-programmed controls. The liquid level monitoring must only permit start-up when the level is between 130 mm and 170 mm (hf min/hf max for 2BV5121). Flow monitoring must trip at ≤50% of design flow. Design for independence per EN ISO 13849.

Operating Instructions — L-BV2 ATEX, Concerning 5.2.3, page 5-6
Maintenance
Replace or re-grease bearings every 2 years or 18,000 h

Ball bearings must be serviced by a service technician every 2 years or 18,000 operating hours, whichever comes first. Use grease type UNIREX N3 (ESSO) or equivalent per DIN 51825-K3N, filling approximately 50% of the free space in ball bearings and 65% of adjacent areas. For ATEX units, weekly dust removal is also required. Operator may not perform dismantling work.

Operating Instructions — L-BV2, Maintenance, page 28; ATEX supplement, Concerning 9.1, page 8
Process Limits
Do not exceed 100 Nm tightening torque on piping

When connecting suction and discharge piping, the tightening torque must not exceed 100 Nm. Over-tightening can crack the casing or damage the threaded connections, leading to leaks and potential safety hazards. Use appropriate gaskets and ensure proper alignment to avoid stress on the ports.

Operating Instructions — L-BV2, Installation, page 16

Selection & Integration Q&A

When should I choose the 2BV5121 over the 2BV5111 or 2BV5131?

Choose the 2BV5121 when you need ~40–45 m³/h at 50/60 Hz with an 11 kW motor. The 2BV5111 offers only 7.5 kW and lower flow, while the 2BV5131 has 15 kW and is a larger or differently optimized unit. The 2BV5121 balances flow and power for medium-duty vacuum or compressor applications.

What are the requirements for the operating-liquid supply system when integrating this compressor?

The operating liquid (typically water) must be supplied at a temperature between +5 °C and +80 °C (nominal +15 °C) and at the design flow rate. For the 2BV5121, the first fill quantity is 3.0 L. If the gas/vapour temperature exceeds 80 °C, increase the operating-liquid flow to 2× the design flow. Ensure the liquid is free of particles that could clog the ring; a strainer is recommended for the first 100 hours.

Can I install this compressor outdoors or in a high-altitude location?

The standard 2BV5121 is rated for ambient temperatures of +5 °C to +40 °C and installation altitudes up to 1000 m above sea level. For outdoor installation, provide protection against weather and ensure the IP55 motor is not submerged. For altitudes above 1000 m, consult the manufacturer for derating. ATEX variants have additional restrictions on ambient and operating-liquid temperatures.

What maintenance items and accessories are not included with the base compressor that I need to plan for?

The base delivery does not include the operating-liquid supply system, suction strainer (required for first 100 hours), or monitoring sensors for ATEX operation. You must provide a liquid separator, flow monitor, pressure switch, and liquid level sensor if required. Bearings need re-greasing every 2 years or 18,000 hours with UNIREX N3 grease. For ATEX, bleeder resistors and certified sensors are mandatory.

Dimensional Drawings & Technical Documentation

Technical documentation

PDF
Technical Data Sheet — L-BV5 2BV5121 IE3 compressor (EN)
Datasheet ·428,8 КБ ·3 pp.
View PDF
PDF
Operating Instructions — L-BV2 (EN)
Manual ·1,9 МБ ·32 pp.
View PDF
PDF
Operating Instructions — L-BV2 ATEX (EN)
Manual ·951,4 КБ ·12 pp.
View PDF