Operating Instructions — C-VLR 401 vacuum pump (BA 886-70-FU, EN)
Technical Reference Summary
Covered Models & Document Scope
Covers the contact-free running claw vacuum pumps C-VLR 401 and C-VLR 501 with integrated frequency converter (VSD, Fxxx). Standard version handles dry gases; version "XD" has corrosion-protective coating and condensate drain for water-moist gases. Document BA 886-70-FU-EN, edition 1.0, 10.2017.
Section-by-Section Technical Breakdown
Describes the machine layout, data plates, working principle and application limits. The pump is a double-shaft dry claw rotary piston pump with gearbox oil lubrication, non-return valve, micro-filter and integral frequency converter for infinitely variable speed. Continuous operation is permitted between 700 mbar (abs.) and 200 mbar (abs.) inlet pressure.
- Connection flange on inlet side, exhaust silencer on pressure side; non-return valve prevents ventilation of the evacuated system after stop.
- Counter-rotating claw rotors synchronised by oil-lubricated gear pair; gearbox and compression chamber separated by special seals.
- Cooling air drawn between machine and insulating hood by drum fan; cooling air inlet and outlet must be at least 30 cm from adjacent walls.
- Continuous operation at any pressure between 700 mbar (abs.) and 200 mbar (abs.) inlet pressure.
- When evacuating closed systems, volume to be evacuated must be no more than 2 % of nominal suction capacity.
- Suction capacity with unrestricted suction: 380 m3/h (C-VLR 401) and 495 m3/h (C-VLR 501) at 50 Hz.
- Version "XD" suitable for water-moist gases (water vapour); standard version for non-explosive, non-inflammable, non-aggressive, non-poisonous dry gases and gas-air mixtures.
- Ambient and suction temperature range 5 to 40 °C; contact manufacturer outside this range.
- Frequent switching (about 10 times per hour) or high ambient/intake temperatures may exceed motor winding and bearing temperature limits.
Covers preparation, mechanical installation, pipe connection, oil filling and electrical connection of the drive. The machine must be set up horizontally on a level, straight foundation able to take its weight; cooling air inlets/outlets require at least 30 cm clearance. Electrical installation must be by a qualified electrician to EN 60204, and the frequency converter must be connected per its own operating instructions.
- Machine freely accessible from all sides; ventilation grids and holes must not be closed.
- Oil filling point, oil sight glass and oil outlets must be easily accessible.
- Cooling air inlets and outlets at least 30 cm away from adjacent walls; discharged cooling air must not be re-sucked.
- Machine may only be operated when set up horizontally; foundation level and straight and able to take machine weight.
- Installation on a firm base without anchoring is possible; on a substructure, fixing with flexible buffers is recommended.
- Power reduction noticeable above 1000 m above sea level; contact manufacturer.
- C-VLR 501 must not be operated without covering plates.
- Pipes must only be screwed in by hand; exhaust air must not be restricted (max. pressure difference 50 mbar).
- Fill lubricating oil up to the middle of the sight glasses.
- Frequency converter supply: 3 AC 400 V -15 % to 480 V +10 %, input frequency 47 to 63 Hz, network configurations TN/TT.
- For IP 65, suitable cable glands or shutters must be provided.
Covers initial start-up, rotation-direction check, post-run recommendation, shutdown/storage and re-commissioning. The motor fan must rotate anti-clockwise when viewed from the fan; a phase sequence indicator is used to verify clockwise rotating field. A post-run at 700 mbar (abs.) for approximately 15 to 30 minutes is recommended to remove dampness and impurities.
- Intended direction of rotation shown by rotary direction arrow; when looking at the motor fan it must rotate anti-clockwise.
- Start motor briefly (max. two seconds) to check direction of rotation; use a phase sequence indicator (clockwise rotating field).
- Post-run at 700 mbar (abs.) for approximately 15 to 30 minutes to remove accrued dampness and impurities.
- Version "XD": drain condensate periodically from the silencer depending on application; do not drain at operating temperature.
- Machine must only be switched on again after it stops.
- Surface temperatures on marked components may exceed 70 °C at operating temperature.
- Decommissioning: switch off, close cut-off devices, disconnect from electricity, depressurise slowly, remove pipes, drain condensate (XD), seal connections with adhesive foil.
Defines maintenance intervals and procedures for oil changes, air filter cleaning, coupling inspection and the integrated frequency converter. Oil must be changed every 20,000 operating hours with ISO VG 150 / CLP HC 150 oil; the mesh filter is cleaned or replaced depending on dirt load; the coupling sprocket is checked at least once a year.
- Monthly: check pipes and screws for leaks and proper seating; check terminal box and cable inlet holes for leaks; clean ventilation slots and motor cooling ribs; check oil level.
- Depending on application, at least monthly: drain condensate from silencer (version "XD").
- Every 20,000 operating hours: change oil.
- Clean intake air filter depending on how dirty the discharged medium is.
- At least once a year: check coupling wear.
- Oil viscosity must comply with ISO VG 150 per DIN 51519; designation per DIN 51502: CLP HC 150; recommended GEAR-LUBE 150 or equivalent.
- Change oil at operating temperature in an atmospherically ventilated area; if not completely emptied, refill amount is reduced.
- If changing oil type, completely empty oil removing device housing and oil cooler.
- Coupling sprocket subject to wear; defective sprocket may lead to rotor shaft breaking.
- Frequent starting and high ambient temperature reduce coupling sprocket service life.
- For repairs, a fully completed, signed declaration of harmlessness must accompany each machine sent to an Elmo Rietschle Service centre.
- Only use original spare parts or parts approved by the manufacturer.
Lists key mechanical and acoustic data for C-VLR 401 and C-VLR 501. Sound pressure level, weight, dimensions, connection sizes and oil quantity are given; further data are in data sheet D 886-60.
- Sound pressure level (max.) per EN ISO 3744, tolerance ±3 dB(A): C-VLR 401 79 dB(A) at 50 Hz, 82 dB(A) at 60 Hz.
- Weight: C-VLR 401 470 kg, C-VLR 501 510 kg (may differ depending on motor manufacturer).
- Length: C-VLR 401 1169 mm, C-VLR 501 1143 mm; width 598 mm; height 963 mm.
- Vacuum connection G 3; exhaust air outlet G 3; condensate drain silencer G ½.
- Correct amount of oil: C-VLR 401 1.75 l, C-VLR 501 1.8 l.
Key Integration, Operating & Safety Requirements
| Specification / Condition | Engineering Implication | Applies To |
|---|---|---|
| Continuous operation permitted at any pressure between 700 mbar (abs.) and 200 mbar (abs.) inlet pressure. p.14 ↗ | Select and set the process operating window within this range; operation outside may be outside designated use. | C-VLR 401 and C-VLR 501 |
| When evacuating closed systems, the volume to be evacuated must be no more than 2 % of the nominal suction capacity. p.14 ↗ | Size evacuated volumes accordingly to avoid excessive evacuation times or pump overload. | C-VLR 401 and C-VLR 501 |
| Suction capacity with unrestricted suction is 380 m3/h (C-VLR 401) and 495 m3/h (C-VLR 501) at 50 Hz. p.14 ↗ | Use these values for preliminary sizing; refer to data sheet D 886-60 for suction capacity versus intake pressure. | C-VLR 401 and C-VLR 501 |
| Ambient and suction temperature must be between 5 and 40 °C. p.7 ↗ | Install in a location and process where both ambient and intake temperatures remain within this range; contact manufacturer outside. | C-VLR 401 and C-VLR 501 |
| Cooling air inlets and outlets must be at least 30 cm away from adjacent walls. p.15 ↗ | Maintain clearance during installation to ensure adequate cooling and avoid recirculation of heated air. | C-VLR 401 and C-VLR 501 |
| Exhaust air must not be restricted; no blocking systems in the exhaust pipe, max. pressure difference 50 mbar. p.16 ↗ | Design exhaust piping without valves or restrictions exceeding 50 mbar differential; check exhaust pipe regularly for impurities. | C-VLR 401 and C-VLR 501 |
| Frequency converter input voltage 3 AC 400 V -15 % to 480 V +10 %, input frequency 47 to 63 Hz, network configurations TN/TT. p.17 ↗ | Verify site supply and earthing system match these values before connecting the drive. | C-VLR 401 and C-VLR 501 VSD |
| For IP 65 protection, suitable cable glands or shutters must be provided. p.17 ↗ | Select and install cable entries rated for IP 65 to maintain the frequency converter enclosure rating. | C-VLR 401 and C-VLR 501 VSD |
| Motor fan must rotate anti-clockwise when viewed from the fan; use a phase sequence indicator to verify clockwise rotating field. p.19 ↗ | Check rotation direction before commissioning; wrong direction damages the machine. | C-VLR 401 and C-VLR 501 |
| Recommended post-run at 700 mbar (abs.) for approximately 15 to 30 minutes. p.19 ↗ | Use post-run to remove dampness and impurities and reduce risk of deposits preventing restart. | C-VLR 401 and C-VLR 501 |
| Oil change interval every 20,000 operating hours with clean operations. p.22 ↗ | Plan maintenance intervals accordingly; use oil meeting ISO VG 150 / CLP HC 150. | C-VLR 401 and C-VLR 501 |
| Oil viscosity must comply with ISO VG 150 per DIN 51519; designation per DIN 51502: CLP HC 150; recommended GEAR-LUBE 150 or equivalent. p.22 ↗ | Select only compatible lubricants; if changing oil type, completely empty oil removing device housing and oil cooler. | C-VLR 401 and C-VLR 501 |
| Correct oil quantity: 1.75 l (C-VLR 401), 1.8 l (C-VLR 501). p.28 ↗ | Fill to middle of sight glass; use quantity as reference for oil changes. | C-VLR 401 and C-VLR 501 |
| Coupling sprocket must be checked at least once a year; defective sprocket may lead to rotor shaft breaking. p.24 ↗ | Include annual coupling inspection in maintenance plan; replace worn or damaged sprocket. | C-VLR 401 and C-VLR 501 |
| Sound pressure level (max.) per EN ISO 3744, tolerance ±3 dB(A): 79 dB(A) at 50 Hz and 82 dB(A) at 60 Hz. p.28 ↗ | Use ear protectors for prolonged presence near the running machine. | C-VLR 401 and C-VLR 501 |
| Vacuum connection G 3, exhaust air outlet G 3, condensate drain silencer G ½. p.28 ↗ | Select mating pipework and fittings accordingly; screw pipes in by hand only. | C-VLR 401 and C-VLR 501 |
| Weight 470 kg (C-VLR 401) and 510 kg (C-VLR 501); length 1169 mm and 1143 mm; width 598 mm; height 963 mm. p.28 ↗ | Foundation and lifting equipment must be sized for these masses and dimensions; weight/length may differ depending on motor manufacturer. | C-VLR 401 and C-VLR 501 |
| Power reduction noticeable when installed more than 1000 m above sea level. p.15 ↗ | Contact manufacturer for installation at altitude above 1000 m. | C-VLR 401 and C-VLR 501 |
| C-VLR 501 must not be operated without covering plates. p.15 ↗ | Ensure covering plates are fitted before commissioning the C-VLR 501. | C-VLR 501 |
| Storage ambient conditions: relative humidity 0 % to 80 %, storage temperature -20 °C to +70 °C; do not store for more than 6 months. p.11 ↗ | Respect storage limits before installation; refer to machine storage guidelines I 150 for longer storage. | C-VLR 401 and C-VLR 501 |
Faults & Troubleshooting
| Code / Symptom | Possible Cause | Remedy | Note |
|---|---|---|---|
| Maschine does not run or the frequency converter shows an error message p.27 ↗ | Technical fault of the integrated frequency converter | see enclosed operating instructions 610.00260.40.000 Section 8 | Section 8 |
| Suction capacity is insufficient p.27 ↗ | The mesh filter is dirty | Clean or replace the filter | Section 7.2.2, Section 7.4 |
| Suction capacity is insufficient p.27 ↗ | The suction pipe is too long or too narrow | Check the hose or the pipe | Section 5.3 |
| Suction capacity is insufficient p.27 ↗ | Machine or system leaking | Check the pipework and screw connections for leaks and to ensure that they are firmly seated. | Section 7.2 |
| Final pressure (max. vacuum) is not reached p.27 ↗ | Machine or system leaking | Check the pipework and screw connections for leaks and to ensure that they are firmly seated. | Section 7.2 |
| Machine gets too hot p.27 ↗ | Ambient or intake temperature is too high | Ensure it is being used properly | Section 2.3 |
| Machine gets too hot p.27 ↗ | Cooling air supply is obstructed | Check environmental conditions | Section 5.1 |
| Machine gets too hot p.27 ↗ | Cooling air supply is obstructed | Clean ventilation slots | Section 7.2 |
| The machine makes an abnormal noise p.27 ↗ | Deposits on the rotary piston | Clean the working space and the rotary piston | Elmo Rietschle Service |