BINDER CBF 260
BINDER ·Made in Germany · In Active Production

BINDER CBF 260

BINDER CBF 260 — Incubators with Temperature 6…50 °C.

The CBF 260 is a 267 L CO2 incubator with hot-air sterilization and active humidity regulation (50–95 % RH), configured as the 230 V standard version (CBF260-230V, Art. 9040-0215) with a 200–230 V / 50/60 Hz single-phase supply. It covers +6 to 50 °C with 0.1 K fluctuation and 0.4 K uniformity, and is distinguished within the CBF series by its 260-size chamber and humidity control, serving as the controlled-environment stage for cell and tissue culture where both CO2 and humidity must be held.

Temperature
6…50 °C

Direct drop-in replacements

⚖️ Compare
⚖️ Compare
⚖️ Compare
⚖️ Compare

BINDER CBF Series — Model Comparison & Selection

Model Temperature, °CDepth, cmHeight, cmInterior volume, LPermitted load, kgWidth, cm
CBF 260 Current 6–5078.51022674074
CBF 170 6–5071.5871703068

Full specifications

Core Performance & Functional Specifications
Temperature 6...50 °C
CO2 recovery time 6 min (all models)
Interior volume 267 L (all models)
Load per rack 10 kg (all models)
Nominal power 1.5 kW (all models)
Permitted load 40 kg (all models)
Temperature fluctuation 0.1 K
Temperature uniformity 0.4 K
Back wall clearance 100 mm (all models)
Side wall clearance 50 mm (all models)
Article Number mfr 9040
Recovery time after door was opened for 30 s at 37°C mfr 6 min
Dimensions, Weight & Mechanical Design
Depth 785 mm (all models)
Height 1020 mm (all models)
Width 740 mm (all models)
Electrical, Power & Drive Specifications
Power frequency 50/60 Hz (all models)
Rated voltage 200...230 V (CBF260-230V / CBF260-230V-O)
Unit fuse 10.0 A (CBF260-230V / CBF260-230V-O)
Operating Conditions, Environment & Protection
Humidity range 50...95 % RH

Description

Construction and series positioning

Behavior under load and in operation

Installation, connection and control

Integration & Operating Notes

Electrical
230 V version needs a 10 A fused single-phase supply

The CBF260-230V draws 1.5 kW nominal on a 200–230 V, 50/60 Hz single-phase supply and is protected by a 10.0 A unit fuse; the upstream circuit and CEE 7/7 outlet must be rated accordingly, and the 100–120 V UL variant is a different model code requiring a NEMA 5-20 supply.

Data Sheet Model CBF 260 en.pdf; Factory Specification Sheet
Mounting
Keep 100 mm rear and 50 mm side clearance for airflow

The chamber requires 100 mm clearance at the back and 50 mm at the sides; blocking these gaps compromises heat rejection and temperature uniformity, and the rear-mounted control panel must remain accessible for connection and service.

Factory Specification Sheet; Instruction Manual, Section 4 Installation and Connections
Process Limits
Do not abort sterilization before the 4-hour effective phase ends

Terminating the cycle before 4 hours leaves sterilization ineffective; termination after 4 hours, during the cooling phase, still counts as successful. Plan the 10-hour window so the cycle is not interrupted for access.

Instruction Manual, Sections 21.3.4.1 and 21.3.4.2
Control & I/O
Tolerance alarms only arm after the setpoint is first reached

A tolerance-range alarm (e.g. ±2 °C around a 37 °C setpoint giving 35–39 °C) does not trigger until the setpoint has been reached once; configure alarm delay times for temperature, CO2 and humidity to avoid nuisance trips during door openings, and note the zero-voltage relay resets with the alarm.

Instruction Manual, Sections 11.3 and 11.5 Notification and Alarm Functions
Maintenance
Maintenance message at 8760 h or two years cannot be user-cleared

After 8760 operating hours or two years the controller displays a maintenance message that reappears every two weeks after acknowledgement until reset by BINDER Service; annual maintenance is required, including the steam humidifier, and electrical safety testing per EN 50678/VDE 0701 and EN 50699/VDE 0702 is recommended at commissioning and annually.

Instruction Manual, Sections 22.1 and 22.5 Maintenance and Service
Maintenance
Replace the door gasket only with the chamber cold

The door gasket must be replaced only when the chamber is cold; handling it warm can damage the gasket and compromise the seal, affecting humidity and temperature recovery.

Instruction Manual, Section 22.5 Maintenance and Service

Selection & Integration Q&A

When should I choose the CBF 260 over the CBF 170, and when is the -O or UL variant the right call?

Pick the CBF 260 when 267 L interior volume is needed; the CBF 170 offers the same +6 to 50 °C range in a smaller chamber. Choose the -O variant only if 0.2–20 % O2 control is required, and the UL 100–120 V version for North American supplies; the standard 230 V model covers 200–230 V, 50/60 Hz.

What gas and water supplies must be provided alongside the chamber?

CO2 (and O2/N2 if the -O option is fitted) is supplied via gas cylinder connection kits; the CBF humidity system needs a water source — prefilled water bottle, freshwater bag or freshwater can — selected per lab setup and water quality, since humidifier maintenance depends on it.

What maintenance and accessories are needed beyond the base delivery?

Annual maintenance is required, including the steam humidifier, with a service message at 8760 h or two years that only BINDER Service can reset; electrical safety testing is recommended annually. Gas cylinder connection kits, water supply sets, APT-COM 4 software, access ports and stacking adapters are accessories, not included.

Dimensional Drawings & Technical Documentation

Technical documentation

PDF
Data Sheet Model CBF 260 en
Datasheet ·432,2 КБ ·9 pp.
View PDF
PDF
CB+CBF (E7.1) 01 2026 en
Manual ·19,4 МБ ·201 pp.
View PDF