Operating Instructions — C-VLR 60 vacuum pump (BA 880-28-DE, DE)

Technical Reference Summary

Covered Models & Document Scope

This operating manual (BA 880-28-DE, edition 1.3.2015) covers the two-shaft claw vacuum pump ZEPHYR C-VLR 60 (28), a ready-to-connect pump/motor unit. The EC declaration of incorporation lists the C-VLR series types C-VLR 60, 100, 120, 150, 250, 251, 300, 400, 500, 301, 501 and 1000, but this manual's technical data and operating limits apply specifically to C-VLR 60 (28).

Section-by-Section Technical Breakdown

pp. 12-13
Design and Function

The C-VLR is a two-shaft rotary claw vacuum pump with non-contacting, dry-running claw rotors synchronized by a gear pair. Gears and motor-side bearings are oil-lubricated in a gearbox that also holds the oil supply; the pumping chamber is free of sealing and lubricating media. A separately driven fan (external fan) supplies cooling air, and the compressor housing, rotors, cover and flanges are coated for corrosion resistance.

  • Two-shaft rotary claw principle, contact-free and dry running
  • Gear pair synchronizes counter-rotating claw rotors
  • Gearbox oil lubricates gears and motor-side bearings
  • Pumping chamber free of sealing and lubricating media
  • External fan (Abb. 2/V) draws fresh cooling air at E and discharges heated air at F
  • Drive via coupling with elastomer element from flanged standard three-phase motors
  • Corrosion protection: DURNI-COAT 771 compressor housing, DURNI-COAT 571 rotors, HART-COAT CU-PTFE cover and connection flanges
pp. 13
Operating Ranges

The C-VLR 60 (28) is approved for continuous operation in three defined duty ranges: evacuating closed vessels up to 1.2 m3 from atmospheric pressure to ultimate vacuum with a sufficiently sized backing pump; compressing from 100 ± 20 mbar (abs.) to 300 ± 50 mbar (abs.); and compressing from 300 mbar (abs.) to 1 bar (abs.) up to a maximum of 1.05 bar (abs.). The operator is responsible for staying within these ranges; the pump has no protective devices against operation outside them.

  • Evacuation of closed vessels max. 1.2 m3 from atmospheric pressure to ultimate vacuum, with adequately dimensioned backing pump
  • Compression from 100 ± 20 mbar (abs.) to 300 ± 50 mbar (abs.)
  • Compression from 300 mbar (abs.) to 1 bar (abs.) to max. 1.05 bar (abs.)
  • No built-in protection against operation outside stated ranges
  • At approx. 12 starts per hour or elevated ambient/suction temperature, motor winding and bearing limit temperature may be exceeded; consult manufacturer
  • Outdoor installation requires protection from environmental influences (e.g. protective roof)
pp. 14
Installation

Installation requires free access from all sides, unobstructed ventilation openings, no external vibration, and no intake of hot exhaust air from other machines. Cooling-air inlet and outlet must have at least 30 cm clearance to adjacent walls, and the machine must be operated only in horizontal mounting position. The floor must be level and capable of carrying the machine weight; fixing on a substructure with elastic buffer elements is recommended.

  • Machine freely accessible from all sides
  • Do not close ventilation grilles or openings
  • No external vibration
  • Do not draw in hot exhaust air from other machines for cooling
  • Oil fill point, oil sight glasses and oil drains must be easily accessible
  • Cooling-air inlet and outlet at least 30 cm from adjacent walls; discharged cooling air must not be re-aspirated
  • Only horizontal mounting position permitted
  • Above 1000 m above sea level a power reduction is noticeable; consult manufacturer
  • Suction-side filters should be installed by the operator to protect against contaminated intake air
  • Level, straight floor with load capacity for machine weight
  • Installation on solid ground possible without anchoring; on a substructure, fastening via elastic buffer elements recommended
pp. 15
Piping Connection

The vacuum connection is at Abb. 2/A and the discharge at Abb. 2/B. Pipes must be screwed in by hand only to avoid excessive forces and torques on the unit. Long or narrow suction lines reduce pumping speed; connection lines longer than 3 m should include check valves (ZRK) to prevent reverse running after shutdown, and the discharge line must not be throttled.

  • Vacuum connection at Abb. 2/A; discharge at Abb. 2/B
  • Screw pipes in by hand only
  • Too narrow and/or too long suction line reduces pumping speed
  • For connection lines longer than 3 m with the same pipe cross-section as the machine connection, check valves (ZRK) are recommended to prevent reverse running after shutdown
  • No shut-off devices in the discharge line; max. pressure difference 30 mbar
  • Connected discharge line must be checked regularly for contamination
pp. 16, 20, 24
Oil Filling

Lubricating oil for gears and bearings is filled at the oil fill point (Abb. 2/H) up to the middle of the sight glasses (Abb. 2/I), then the fill point is closed. Oil viscosity must be ISO-VG 150 per DIN 51519, designation CLP HC 150 per DIN 51502; GEAR-LUBE 150 or equivalent oils are recommended.

  • Fill oil at Abb. 2/H to the middle of the sight glasses (Abb. 2/I)
  • Close oil fill point after filling
  • Oil viscosity ISO-VG 150 per DIN 51519
  • DIN 51502 designation CLP HC 150
  • Recommended oil: GEAR-LUBE 150 or equivalent oils of other manufacturers
  • Oil fill quantity 0.4 l
pp. 16
Motor Connection

Electrical installation must be performed only by a qualified electrician in accordance with EN 60204, and the operator must provide a main switch. Motors comply with DIN EN 60034, protection IP 55 and insulation class F; motor data must be compared with the supply network. A motor protection switch and a cable gland for strain relief are required, and delayed-trip motor protection switches are recommended because short-term overcurrent can occur during cold start.

  • Electrical installation only by qualified electrician per EN 60204
  • Main switch to be provided by the operator
  • Motors per DIN EN 60034, IP 55, insulation class F
  • Connection diagram in motor terminal box (not applicable with plug connection)
  • Compare motor data with supply: current type, voltage, frequency, permissible current
  • Motor protection switch and cable gland for strain relief required
  • Delayed-trip motor protection switch recommended due to short-term overcurrent at cold start
  • Without power reduction: ±5% voltage deviation, ±2% frequency deviation
pp. 17-18
Commissioning and Decommissioning

Commissioning requires attention to hot surfaces above 70°C, hearing protection due to noise, and restarting only after standstill. Direction of rotation is marked by an arrow on the motor flange; for the check the motor may be started briefly (max. two seconds) and, viewed from the motor fan, must rotate counter-clockwise. Decommissioning includes switching off, closing shut-off devices if present, disconnecting from power, depressurizing, removing pipes and sealing connections.

  • Hot surfaces can exceed 70°C in warm operating state; avoid contact
  • Use hearing protection during prolonged stay near running machine
  • Restart only after the machine has come to a standstill
  • Direction arrow on motor flange (Abb. 2/O)
  • Direction check: brief start max. two seconds; viewed from motor fan, rotation must be counter-clockwise
  • Use a phase-sequence indicator to check clockwise rotating field
  • Longer reverse running can damage the machine
  • Decommissioning: switch off, close shut-off devices if present, disconnect from power, slowly open pipes to depressurize, remove pipes/hoses, seal suction and discharge connections with adhesive film
pp. 19-21
Maintenance

Maintenance intervals depend on load. Monthly tasks include checking piping and screw connections for leaks and tightness, checking terminal box and cable entries for leaks, cleaning ventilation slots and motor cooling fins, checking the external fan, and checking oil level. Oil change is due every 5,000 operating hours; coupling wear must be checked at least once per year; a general overhaul (bearings, sleeves, sealing rings) is recommended every 20,000 hours by Elmo Rietschle Service.

  • Monthly: check piping and screw connections for leaks and tightness, re-seal/retighten if necessary
  • Monthly: check terminal box and cable entry openings for leaks
  • Monthly: clean ventilation slots and motor cooling fins
  • Monthly: check function of external fan (Abb. 2/V)
  • Monthly: check oil level
  • Every 5,000 h: oil change
  • At least once per year: check coupling wear
  • Every 20,000 h (recommended): general overhaul of pump (renew bearings, sleeves and sealing rings)
  • Oil change only with machine at operating temperature and vented to atmosphere
  • When changing oil type, drain oil chamber completely
  • Coupling ring gear wear can lead to rotor shaft breakage; replace if damaged or worn
  • Frequent starts and high ambient temperature shorten coupling ring gear life
pp. 24
Technical Data

Technical data for C-VLR 60 (28): sound pressure level 78 dB(A) at 50 Hz and 80 dB(A) at 60 Hz (tolerance ±3 dB(A)); sound power level 94 dB(A) at both 50 and 60 Hz; weight 47 kg; length 625 mm, width 210 mm, height 295 mm; vacuum connection G 1; discharge G 1; oil fill quantity 0.4 l. Length and weight may vary depending on motor make.

  • Sound pressure level EN ISO 3744: 78 dB(A) at 50 Hz, 80 dB(A) at 60 Hz, tolerance ±3 dB(A)
  • Sound power level: 94 dB(A) at 50 Hz and 60 Hz
  • Weight: 47 kg
  • Length: 625 mm
  • Width: 210 mm
  • Height: 295 mm
  • Vacuum connection: G 1
  • Discharge outlet: G 1
  • Oil fill quantity: 0.4 l
  • Length and weight may deviate depending on motor make

Key Integration, Operating & Safety Requirements

Specification / Condition Engineering Implication Applies To
Ambient operating temperature must be between 5 and 40°C. p.7 ↗ Installation location and ventilation must keep ambient temperature within this range; consult manufacturer outside it. C-VLR 60 (28)
Suction temperature must be between 5 and 60°C. p.7 ↗ Process gas temperature at the suction connection must be controlled within this range. C-VLR 60 (28)
Evacuation of closed vessels is limited to a volume of max. 1.2 m3 from atmospheric pressure to ultimate vacuum with a sufficiently dimensioned backing pump. p.13 ↗ Size the vessel and backing pump so this volume limit is not exceeded in continuous operation. C-VLR 60 (28)
Compression from 100 ± 20 mbar (abs.) to 300 ± 50 mbar (abs.) is permitted. p.13 ↗ For this duty range, suction pressure must be held at 100 ± 20 mbar (abs.) and discharge at 300 ± 50 mbar (abs.). C-VLR 60 (28)
For suction pressure between 300 mbar (abs.) and 1 bar (abs.), the medium may be compressed to max. 1.05 bar (abs.). p.13 ↗ Do not exceed 1.05 bar (abs.) discharge pressure in this operating range. C-VLR 60 (28)
At approximately 12 starts per hour or elevated ambient and suction temperature, the limit overtemperature of the motor winding and bearings may be exceeded. p.13 ↗ For high cycling or hot environments, consult the manufacturer before selection. C-VLR 60 (28)
Cooling-air inlet and outlet must have at least 30 cm clearance to adjacent walls, and discharged cooling air must not be re-aspirated. p.14 ↗ Maintain 30 cm minimum clearance and arrange airflow to avoid recirculation. C-VLR 60 (28)
The machine may only be operated in horizontal mounting position. p.14 ↗ Mount the pump on a level, horizontal surface; other orientations are not permitted. C-VLR 60 (28)
Above 1000 m above sea level a power reduction is noticeable. p.14 ↗ For high-altitude installations, consult the manufacturer for derating. C-VLR 60 (28)
For connection lines longer than 3 m with the same pipe cross-section as the machine connection, check valves (ZRK) should be installed to prevent reverse running after shutdown. p.15 ↗ Include check valves in long discharge/suction lines to protect the pump from reverse rotation. C-VLR 60 (28)
No shut-off devices may be installed in the discharge line; maximum pressure difference is 30 mbar. p.15 ↗ Keep the discharge path unobstructed and verify pressure drop does not exceed 30 mbar. C-VLR 60 (28)
Motors are IP 55 and insulation class F, compliant with DIN EN 60034. p.16 ↗ Electrical installation must respect IP 55 sealing and class F insulation requirements. C-VLR 60 (28)
Without power reduction, voltage deviation of ±5% and frequency deviation of ±2% are permissible. p.16 ↗ Verify supply voltage and frequency are within these tolerances before commissioning. C-VLR 60 (28)
Direction check: motor may be started briefly for max. two seconds; viewed from the motor fan, rotation must be counter-clockwise. p.18 ↗ Confirm correct rotation before continuous operation; longer reverse running can damage the machine. C-VLR 60 (28)
Oil change interval is every 5,000 operating hours under clean operation. p.20 ↗ Plan oil changes at 5,000 h; use ISO-VG 150 / CLP HC 150 oil such as GEAR-LUBE 150. C-VLR 60 (28)
Oil viscosity must be ISO-VG 150 per DIN 51519; DIN 51502 designation CLP HC 150. p.20 ↗ Use only oil meeting this specification; recommended GEAR-LUBE 150 or equivalent. C-VLR 60 (28)
Coupling wear must be checked at least once per year; a defective ring gear can lead to rotor shaft breakage. p.21 ↗ Include annual coupling inspection in the maintenance plan and replace worn ring gears. C-VLR 60 (28)
General overhaul (renew bearings, sleeves and sealing rings) is recommended every 20,000 hours by Elmo Rietschle Service. p.19 ↗ Schedule factory service at 20,000 h to maintain reliability. C-VLR 60 (28)
Sound pressure level is 78 dB(A) at 50 Hz and 80 dB(A) at 60 Hz (tolerance ±3 dB(A)); sound power level is 94 dB(A). p.24 ↗ Use hearing protection for prolonged presence near the running machine. C-VLR 60 (28)
Oil fill quantity is 0.4 l; vacuum connection and discharge are G 1; weight 47 kg; dimensions 625 × 210 × 295 mm. p.24 ↗ Use these values for piping, mounting and oil filling planning; length and weight may vary with motor make. C-VLR 60 (28)

Faults & Troubleshooting

Code / Symptom Possible Cause Remedy Note
Maschine wird durch Motorschutzschalter abgeschaltet p.23 ↗ Netzspannung/ Frequenz stimmt nicht mit den Motordaten überein Überprüfung durch Elektrofachkraft Kapitel 5.5
Maschine wird durch Motorschutzschalter abgeschaltet p.23 ↗ Anschluss am Motorklemmbrett ist nicht korrekt Überprüfung durch Elektrofachkraft Kapitel 5.5
Maschine wird durch Motorschutzschalter abgeschaltet p.23 ↗ Motorschutzschalter ist nicht korrekt eingestellt Überprüfung durch Elektrofachkraft Kapitel 5.5
Motorschutzschalter löst zu rasch aus p.23 ↗ Kurzzeitiger Überstrom beim Kaltstart Verwendung eines Motorschutzschalters mit überlastabhängiger Abschaltverzögerung, die den kurzzeitigen Überstrom beim Start berücksichtigt (Ausführung mit Kurzschluss- und Überlastauslöser nach VDE 0660 Teil 2 bzw. IEC 947-4)
Saugleistung ist ungenügend p.23 ↗ Saugleitung ist zu lang oder zu eng Schlauch- bzw. Rohrleitung überprüfen Kapitel 5.3
Saugleistung ist ungenügend p.23 ↗ Undichtigkeit an der Maschine oder im System Verrohrung und Verschraubungen auf Undichtigkeiten und festen Sitz prüfen Kapitel 7.2
Enddruck (max. Vakuum) wird nicht erreicht p.23 ↗ Undichtigkeit an der Maschine oder im System Verrohrung und Verschraubungen auf Undichtigkeiten und festen Sitz prüfen Kapitel 7.2
Maschine wird zu heiß p.23 ↗ Umgebungs- oder Ansaugtemperatur ist zu hoch Bestimmungsgemäße Verwendung beachten Kapitel 2.3
Maschine wird zu heiß p.23 ↗ Kühlluftstrom wird behindert Umgebungsbedingungen prüfen Kapitel 5.1
Maschine wird zu heiß p.23 ↗ Kühlluftstrom wird behindert Lüftungsschlitze reinigen Kapitel 7.2
Maschine erzeugt abnormales Geräusch p.23 ↗ Ablagerungen auf den Drehkolben Arbeitsraum und die Drehkolben reinigen Elmo Rietschle Service