BINDER CBF 260
BINDER CBF 260 — Incubators with Temperature 6…50 °C.
The CBF 260 is a 267 L CO2 incubator with hot-air sterilization and active humidity regulation (50–95 % RH), configured as the 230 V standard version (CBF260-230V, Art. 9040-0215) with a 200–230 V / 50/60 Hz single-phase supply. It covers +6 to 50 °C with 0.1 K fluctuation and 0.4 K uniformity, and is distinguished within the CBF series by its 260-size chamber and humidity control, serving as the controlled-environment stage for cell and tissue culture where both CO2 and humidity must be held.
Direct drop-in replacements
BINDER CBF Series — Model Comparison & Selection
| Model | Temperature, °C | Depth, cm | Height, cm | Interior volume, L | Permitted load, kg | Width, cm |
|---|---|---|---|---|---|---|
| CBF 260 Current | 6–50 | 78.5 | 102 | 267 | 40 | 74 |
| CBF 170 | 6–50 | 71.5 | 87 | 170 | 30 | 68 |
Full specifications
| Temperature | 6...50 °C |
| CO2 recovery time | 6 min (all models) |
| Interior volume | 267 L (all models) |
| Load per rack | 10 kg (all models) |
| Nominal power | 1.5 kW (all models) |
| Permitted load | 40 kg (all models) |
| Temperature fluctuation | 0.1 K |
| Temperature uniformity | 0.4 K |
| Back wall clearance | 100 mm (all models) |
| Side wall clearance | 50 mm (all models) |
| Article Number mfr | 9040 |
| Recovery time after door was opened for 30 s at 37°C mfr | 6 min |
| Depth | 785 mm (all models) |
| Height | 1020 mm (all models) |
| Width | 740 mm (all models) |
| Power frequency | 50/60 Hz (all models) |
| Rated voltage | 200...230 V (CBF260-230V / CBF260-230V-O) |
| Unit fuse | 10.0 A (CBF260-230V / CBF260-230V-O) |
| Humidity range | 50...95 % RH |
Description
Construction and series positioning
- The CBF 260 is the 260-size member of the CBF series (sibling CBF 170 shares the +6 to 50 °C range but a smaller chamber); this model provides 267 L interior volume in a 740 mm wide, 1,020 mm high, 785 mm deep net envelope.
- It is a humidifying CO2 incubator: the CBF/CBF-UL humidification system is integral, with a 50–95 % RH range, unlike dry CB variants.
- The standard 230 V version uses a CEE 7/7 plug and a 10.0 A unit fuse; UL 100–120 V and O2-control (-O) versions are separate model codes and are not part of this configuration.
- Control is via the MB2 touchscreen program controller with a sterilizable NDIR CO2 sensor.
Behavior under load and in operation
- Temperature control holds 0.1 K fluctuation and 0.4 K uniformity across the +6 to 50 °C working range; recovery after a 30 s door opening at 37 °C is 6 min.
- Humidity regulation spans 50–95 % RH; the humidifier is a steam type requiring an annual maintenance interval that depends on water quality and steam production.
- Hot-air sterilization runs a 10-hour total cycle: a 4-hour effective sterilization phase followed by a 6-hour cooling phase to 37 °C. CO2 control is deactivated during sterilization and reactivates only after the temperature falls below 80 °C and the sterilization success message is confirmed.
- Load limits: 10 kg per rack and 40 kg total permitted load.
Installation, connection and control
- Rear wall clearance 100 mm and side clearance 50 mm are required; the control panel is on the rear and the instrument panel is oriented per the chamber description.
- Gas connections for CO2 (and O2/N2 where applicable) use gas cylinder connection kits; CBF water supply can be a prefilled water bottle, freshwater bag or freshwater can.
- The MB2 controller supports fixed-value, timer and week programs with setpoint ramps/steps, tolerance-range alarms with configurable delay, a zero-voltage relay alarm output, RS485/Ethernet communication and USB data transfer.
- Overtemperature protection is class 1 with an optional class 3.1 safety controller.
Integration & Operating Notes
The CBF260-230V draws 1.5 kW nominal on a 200–230 V, 50/60 Hz single-phase supply and is protected by a 10.0 A unit fuse; the upstream circuit and CEE 7/7 outlet must be rated accordingly, and the 100–120 V UL variant is a different model code requiring a NEMA 5-20 supply.
The chamber requires 100 mm clearance at the back and 50 mm at the sides; blocking these gaps compromises heat rejection and temperature uniformity, and the rear-mounted control panel must remain accessible for connection and service.
Terminating the cycle before 4 hours leaves sterilization ineffective; termination after 4 hours, during the cooling phase, still counts as successful. Plan the 10-hour window so the cycle is not interrupted for access.
A tolerance-range alarm (e.g. ±2 °C around a 37 °C setpoint giving 35–39 °C) does not trigger until the setpoint has been reached once; configure alarm delay times for temperature, CO2 and humidity to avoid nuisance trips during door openings, and note the zero-voltage relay resets with the alarm.
After 8760 operating hours or two years the controller displays a maintenance message that reappears every two weeks after acknowledgement until reset by BINDER Service; annual maintenance is required, including the steam humidifier, and electrical safety testing per EN 50678/VDE 0701 and EN 50699/VDE 0702 is recommended at commissioning and annually.
The door gasket must be replaced only when the chamber is cold; handling it warm can damage the gasket and compromise the seal, affecting humidity and temperature recovery.
Selection & Integration Q&A
Pick the CBF 260 when 267 L interior volume is needed; the CBF 170 offers the same +6 to 50 °C range in a smaller chamber. Choose the -O variant only if 0.2–20 % O2 control is required, and the UL 100–120 V version for North American supplies; the standard 230 V model covers 200–230 V, 50/60 Hz.
CO2 (and O2/N2 if the -O option is fitted) is supplied via gas cylinder connection kits; the CBF humidity system needs a water source — prefilled water bottle, freshwater bag or freshwater can — selected per lab setup and water quality, since humidifier maintenance depends on it.
Annual maintenance is required, including the steam humidifier, with a service message at 8760 h or two years that only BINDER Service can reset; electrical safety testing is recommended annually. Gas cylinder connection kits, water supply sets, APT-COM 4 software, access ports and stacking adapters are accessories, not included.