BINDER MK 400 CO₂
BINDER ·Made in Germany · In Active Production

BINDER MK 400 CO₂

BINDER MK 400 CO₂ — Climate chambers.

The BINDER MK 400 CO₂ is a 417 L alternating climate chamber with a CO₂ (R744) refrigeration circuit, rated -50…180 °C and 6.8 kW at 400 V / 3 N/PE / 50 Hz. It is the mid-size 400 L modification of the MK (E6) series, distinguished by its extended low-temperature limit and CO₂ refrigerant. It serves rapid temperature-change testing of components and materials under programmable profiles.

BINDER MK Series — Model Comparison & Selection

Model Temperature, °CDepth, cmHeight, cmInterior height, mmInterior volume, LInterior width, mm
MK 400 CO₂ Current -50...180140171700417735
MK 1020 -40–180148200.510209911200
MK 1020 CO₂ -48–180148200.510209911200
MK 115 -40–18086.5172.5480115600
MK 240 -40–18092.5171700228735
MK 240 CO₂ -50...18092.5171700228735
MK 400 -40–180140171700417735
MK 56 -40–18077.8144.542060400
MK 720 -40–180114200.510207341200
MK 720 CO₂ -48–180114200.510207341200

Full specifications

Core Performance & Functional Specifications
Temperature -50...180
Interior volume 417 L
Load per rack 30 kg (MK400CO2-400V, 50 Hz)
Nominal power 6.8 kW
Article Number mfr 9020
Dimensions, Weight & Mechanical Design
Depth 1400 mm (MK400CO2-400V, 50 Hz)
Height 1710 mm (MK400CO2-400V, 50 Hz)
Interior height 700 mm (MK400CO2-400V, 50 Hz)
Interior width 735 mm (MK400CO2-400V, 50 Hz)
Width 1115 mm (MK400CO2-400V, 50 Hz)
Net weight of the unit (empty) mfr 380 kg
Electrical, Power & Drive Specifications
Power frequency 50 Hz
Rated voltage 400 V
Unit fuse 16.0 A
Phase (Nominal voltage) mfr 3 N/PE
Operating Conditions, Environment & Protection
Cooling down time from 180°C to -40°C mfr 80 min
Standards, Safety & General Data
Average heating-up rate according to IEC 60068-3-5 between -40°C and 180°C mfr 5.7 K/min

Description

Construction and series positioning

Thermal behaviour

Control, installation and operation

Integration & Operating Notes

Electrical
Supply must include a type B residual current breaker

The chamber may only be operated on a circuit protected by a type B RCD; a type A or AC device does not cover the CO₂ refrigeration drive's fault currents. Verify the site distribution board before commissioning and size the 16.0 A fuse and 6.8 kW load accordingly.

Instruction Manual, Safety labels chap. 1.5 p.9
Mounting
Room volume must be verified for CO₂ refrigerant safety

Because the refrigerating circuit holds 1.40 kg of R744 at up to 120 bar, the installation room volume must be calculated according to EN 378-1:2016+A1:2020 before startup. Unventilated recesses and damp areas are prohibited, and prescribed minimum distances must be kept for heat dispersal.

Instruction Manual, Safety chap. 1.8 p.12-13
Process Limits
Charging material must stay below flash or sublimation point

The chamber temperature must remain below the flash point or sublimation point of the load, and no explosive mixture with air may form. Confirm the material's thermal limits against the -50…180 °C working range before programming a profile.

Instruction Manual, Safety chap. 1.8 p.13
Maintenance
Annual maintenance and electrical repeat inspection are mandatory

Schedule maintenance at least once a year and an electrical repeat inspection per EN 50678/VDE 0701 and EN 50699/VDE 0702 before initial startup and after any maintenance or repair. Refrigeration work must be logged in a service log book and performed only by EN 13313-trained personnel; circuit repairs currently only at BINDER.

Instruction Manual, Maintenance chap. 21.1-21.2 p.107-108
Maintenance
Service message at 8760 h is a reminder, not a fault

After 8760 operating hours or two years the controller shows a service message; once acknowledged it reappears every two weeks until reset by BINDER Service. Plan the service visit rather than troubleshooting the chamber as if it had failed.

Instruction Manual, Maintenance chap. 21.2 p.108
Cooling & Media
Check condenser fan grid weekly in dusty rooms

With increased dust in ambient air, inspect the fan grid behind the left maintenance access flap every week and clean by suction if dirty; clean the condenser fan several times a year. Blocked airflow degrades cooling performance and can overheat the refrigerating module.

Instruction Manual, Maintenance chap. 21.2 p.108
Maintenance
Replace door gasket only with chamber cold

The door gasket must be changed only when the chamber is cold; fitting it warm risks deformation and loss of sealing. Coordinate gasket replacement with cool-down periods in the test schedule.

Instruction Manual, Maintenance chap. 21.2 p.108
Process Limits
Inner surfaces reach set-point temperature during operation

Inner surfaces, window, access ports and inner chamber become hot and almost equal the set-point during and shortly after operation. Provide burn protection and allow cool-down before touching; do not load the lower housing cover or climb on it while the door is open.

Instruction Manual, Safety chap. 1.8 p.13-14

Selection & Integration Q&A

When should I choose the MK 400 CO₂ over the MK 240 or MK 1020 CO₂?

Pick the MK 400 CO₂ for 417 L of usable volume and a -50 °C low limit; the MK 240 is smaller and stops at -40 °C, while the MK 1020 CO₂ offers more volume but only -48 °C. Choose this model when mid-size batches need the coldest CO₂ operation.

What electrical supply and protection does the MK 400 CO₂ require from the building?

A 400 V 3 N/PE 50 Hz supply rated for 6.8 kW with a 16.0 A unit fuse, protected by a type B residual current circuit breaker. The installation room volume must also be verified per EN 378-1 for the 1.40 kg CO₂ charge.

What ambient and installation limits apply to the MK 400 CO₂?

Do not install in unventilated recesses or damp areas; keep the prescribed minimum distances for heat dispersal and calculate room volume per EN 378-1:2016+A1:2020. IP 20 means no water exposure, and the rear panel must not be removed.

What maintenance and accessories are needed beyond the base chamber?

Plan annual maintenance, annual electrical repeat inspection per EN 50678/50699, and weekly condenser fan grid checks in dusty rooms. Options such as RS485, analog temperature outputs, Pt 100 object sensor and APT-COM 4 software are not included in base delivery.

Dimensional Drawings & Technical Documentation

Technical documentation

PDF
Data Sheet Model MK CO₂ 400 en
Datasheet ·719,0 КБ ·9 pp.
View PDF
PDF
0714 EN MK CO2 E6 UM 10 2026
Manual ·10,0 МБ ·139 pp.
View PDF