BINDER KB ECO 1020
BINDER ·Made in Germany · In Active Production

BINDER KB ECO 1020

BINDER KB ECO 1020 — Incubators with Temperature 0…70 °C.

The KB ECO 1020 is a 1,020 L thermoelectric (Peltier) cooling incubator with a 0–70 °C working range and 0.1 K uniformity, the largest chamber in the KB ECO series. It is distinguished from smaller siblings (240/400/720) by its 973 mm interior width and 150 kg permitted load, serving long-term storage and incubation at 4–37 °C in pharmaceutical and microbiological workflows.

Temperature
0…70 °C

Direct drop-in replacements

⚖️ Compare
⚖️ Compare
⚖️ Compare
⚖️ Compare

BINDER KB ECO Series — Model Comparison & Selection

Model Temperature, °CDepth, cmHeight, cmInterior volume, LInterior width, mmLoad per rack, kg
KB ECO 1020 Current 0–70114.9192.5102097345
KB ECO 240 0–7079.6146.124765030
KB ECO 400 0–7079.6194.640065030
KB ECO 720 0–7088.5192.570097345

Full specifications

Core Performance & Functional Specifications
Temperature 0...70 °C
Interior volume 1020 L
Load per rack 45 kg
Max. heat compensation 500 W
Nominal power 1.3 kW
Permitted load 150 kg (both variants)
Temperature fluctuation 0.1 K
Temperature uniformity 0.1 K
Back wall clearance 100 mm (both variants)
Side wall clearance 100 mm (both variants)
Article Number mfr 9020
Recovery time after door was opened for 30 s at 37°C mfr 4 min
Dimensions, Weight & Mechanical Design
Depth 1149 mm (both variants)
Height 1925 mm (both variants)
Interior width 973 mm (both variants)
Width 1250 mm (both variants)
Net weight of the unit (empty) mfr 327 kg
Electrical, Power & Drive Specifications
Power frequency 50 Hz
Rated voltage 200...230 V
Unit fuse 16.0 A
Phase (Nominal voltage) mfr 1

Description

Construction and series positioning

Behavior under load and in operation

Installation, control and operation

Integration & Operating Notes

Electrical
Supply and fusing must match the 230 V or UL variant ordered

The 230 V model requires 200–230 V 1~ 50/60 Hz sized for 5.8 A nominal current (1.3 kW), while the UL model requires 100–120 V sized for 7.5 A (0.9 kW). The unit fuse is 16.0 A; connecting a variant to the wrong voltage class will prevent startup or damage the Peltier/controller electronics.

Data Sheet Model KB ECO 1020 en.pdf; Instruction Manual KB ECO (E6.2), chap. 1.6 Type plate
Mounting
Keep 100 mm clearance at back and sides and avoid recesses

The chamber must not be installed in unventilated recesses; prescribed minimum distances of 100 mm at the rear and 100 mm at the sides are required for heat dispersal. Violating these clearances risks overheating damage and degraded Peltier cooling performance.

Instruction Manual KB ECO (E6.2), chap. 1.8 and chap. 3.4
Process Limits
Do not exceed 150 kg total load or 45 kg per rack

The permitted load is 150 kg for the chamber and 45 kg per rack. Exceeding these limits can deform racks or the chamber interior and is outside the validated mechanical design; also account for the 500 W maximum heat compensation when loading heat-generating samples.

Factory Specification Sheet; Instruction Manual KB ECO (E6.2), Technical Description
Process Limits
Loads must be free of acids, halides and explosive substances

Loading material must not contain corrosive ingredients (particularly acids and halides) that attack stainless steel, aluminum and copper components, and the chamber must not be operated in potentially explosive areas. Corrosive damage from such ingredients is excluded from BINDER liability.

Instruction Manual KB ECO (E6.2), chap. 1.9 Intended use
Maintenance
Plan annual maintenance and electrical repeat inspection

Maintenance must be performed at least once a year by licensed electricians or experts authorized by BINDER; warranty is void if non-authorized personnel perform it. An annual repeat electrical inspection per EN 50678/VDE 0701 and EN 50699/VDE 0702 is required, plus tests before initial start-up and before resuming operation after maintenance or repair.

Instruction Manual KB ECO (E6.2), chap. 24.1 and 24.2
Maintenance
Clean the Peltier fan grid more often in dusty ambient air

With increased dust in the ambient air, clean the Peltier fan grid by suction or blowing several times a year. A clogged grid reduces heat rejection and can degrade cooling capacity or trigger overtemperature conditions. The service reminder displays remaining days until maintenance when OK is held for 5 seconds.

Instruction Manual KB ECO (E6.2), chap. 24.2 and 24.3
Environment
IP 20 enclosure must be kept dry and splash-proof

IP protection is 20 per EN 60529, meaning no water protection. The chamber must be set up splash-proof and must not become wet during operation, cleaning or maintenance; cleaning and decontamination must follow the manual's procedures to avoid ingress into electrical and Peltier components.

Instruction Manual KB ECO (E6.2), chap. 1.6 Type plate and chap. 23 Cleaning

Selection & Integration Q&A

When should I choose the KB ECO 1020 rather than the 240, 400 or 720 sibling?

Pick the 1020 when you need the series' largest capacity: 1,020 L interior, 973 mm interior width and 150 kg permitted load. The 240/400/720 share the 0–70 °C range but offer smaller chambers; choose them when floor space or sample volume is lower. Note the 1020's 327 kg empty weight and 1,250 mm net width for site access.

What supply and network infrastructure does the KB ECO 1020 require?

The 230 V variant needs 200–230 V 1~ 50/60 Hz sized for 5.8 A (1.3 kW) with a CEE 7/7 plug; the UL variant needs 100–120 V sized for 7.5 A (0.9 kW) with NEMA 5-20. For multi-chamber monitoring, plan Ethernet addressing and chamber addresses for APT-COM™ 4, which networks up to 100 chambers.

What mounting and duty-cycle limits apply to the KB ECO 1020?

Maintain 100 mm clearance at the back and sides and never install in an unventilated recess; the IP 20 enclosure must stay dry. Do not exceed 150 kg total load or 45 kg per rack, and respect the 500 W maximum heat compensation. The chamber is not for explosive areas or medical-device sterilization.

What maintenance and accessories are needed beyond the base delivery?

Plan annual maintenance by BINDER-authorized personnel plus annual electrical repeat inspection per EN 50678/VDE 0701 and EN 50699/VDE 0702. Clean the Peltier fan grid several times a year in dusty air; replace the door gasket only when cold. APT-COM™ 4 software and USB sticks for data transfer are accessories, not included.

Dimensional Drawings & Technical Documentation

Technical documentation

PDF
Data Sheet Model KB ECO 1020 en
Datasheet ·575,8 КБ ·7 pp.
View PDF
PDF
KB ECO (E6.2) 07 2026 en
Manual ·9,3 МБ ·91 pp.
View PDF