Operating Instructions — L-BV2 (EN)
Technical Reference Summary
Covered Models & Document Scope
Covers liquid ring vacuum pumps/compressors of the L-BV2 and L-BV5 series in standard design: 2BV2060, 2BV2061, 2BV2070, 2BV2071, 2BV5110, 2BV5111, 2BV5121, 2BV5131, 2BV5161, 2BV5410, 2BV5411, 2BV5421, 2BV5470, 2BV5471. Variants include cast iron and stainless steel constructions (stainless only for 2BV2070, 2BV2071, 2BV51..), bronze 2BV5410-.F, cast iron 2BV5410-1G, and explosion-protected designs (covered by separate supplementary instructions, not this manual).
Section-by-Section Technical Breakdown
Provides weights by type and material, minimum clearances for heat dissipation, noise levels at 50/60 Hz, operating speeds, maximum speeds with frequency converters, and tightening torques for non-electrical, electrical, and threaded gland connections.
- Weights range from 25 kg (2BV2060 cast iron) to 264 kg (2BV5161 stainless steel).
- Minimum fan-guard clearance: 34 mm for 2BV206., 53 mm for most others, 80 mm for 2BV5161.
- Sound pressure level 70–77 dB(A) at 1 m, tolerance ±3 dB(A).
- Standard speeds: 2BV2… 3000/3600 min-1; 2BV5110–2BV5131 and 2BV54.. 1500/1800 min-1; 2BV5161 1000/1200 min-1.
- Maximum frequency-converter speeds range from 1597 min-1 (2BV5161) to 4612 min-1 (2BV2060/2061).
- Tightening torques: M4 2.7–3.3 Nm, M5 3.6–4.4 Nm, M6 7.2–8.8 Nm, M8 21.6–26.4 Nm, M10 37.8–46.2 Nm, M12 63.0–77.0 Nm, M16 90–110 Nm for non-electrical connections.
Electrical data refers to the motor rating plate. Operating conditions specify temperature limits for gases/vapours, operating liquid, and ambient air, maximum discharge pressures for vacuum and compressor operation, maximum internal pressure, minimum achievable suction pressure with cavitation notes, design operating-liquid flows, first-fill quantities, and maximum permissible water carry-over.
- Max gas/vapour temperature +80 °C; operating liquid +5 to +80 °C (nominal +15 °C); ambient +5 to +40 °C.
- Max discharge pressure for vacuum operation: 1.1 bar abs (2BV2…), 1.3 bar abs (2BV5…).
- Max internal pressure: 8 bar abs for most types, 6 bar abs for 2BV5410-.F.
- Design operating-liquid flow depends on type and pressure range; first fill 0.5–8.0 L.
- Maximum water carry-over: 2.5x design flow continuous, 7x for max 2 s (2BV2…); 2.5x/5x for 2BV51..; 7x/7x for 2BV5410-.F; absolute limits for 2BV541.-1G, 2BV542., 2BV547.
Covers setup conditions, mechanical connection of suction/discharge and operating-liquid lines, connection of system components, ancillaries, and electrical motor connection including terminal box and frequency converter operation.
- Set up on level, load-bearing surface, shaft horizontal, max altitude 1000 m, max vibration veff = 4.5 mm/s.
- Bolt all mounting feet; intermediate plates supplied for 2BV5110-….2-.S, 2BV5121-….2-.S, 2BV5410-1G.
- Suction/discharge tightening torque must not exceed 100 Nm.
- Fit intake strainer for first 100 operating hours.
- Operating-liquid connection sizes: G3/8 (2BV20, 2BV54..-1G), G3/4 (2BV51, 2BV54..-.F).
- Electrical supply tolerance: ±5% voltage, ±2% frequency; air gaps ≥5.5 mm at UN ≤690 V.
Describes preparation, start-up with operating-liquid supply or self-suction, and checking direction of rotation. Includes warnings against dry running and requirements for pressure/leak testing and motor insulation resistance.
- Do not switch on until system filled with operating-liquid; dry running destroys rotary seals within seconds.
- Measure motor insulation resistance; dry windings if ≤1 kΩ per volt of measurement potential.
- Ensure maximum outlet pressure is not exceeded.
- Check piping/hose connections for leaks before start-up.
Covers operation with automatically controlled or non-automatic operating-liquid supply, operation with self-suction, and checking/correcting the operating-liquid flow-rate.
- Operating-liquid flow must be maintained continuously during operation.
- Flow-rate checking and correction procedures are referenced in chapter 7.4.
- Self-suction operation requires initial filling of the operating chamber before piping installation.
Covers draining down, preparations for long-term shutdown, storage conditions, and commissioning after a long shutdown period.
- Drain operating liquid before long-term shutdown.
- Follow storage conditions and recommissioning steps after extended idle periods.
Specifies maintenance intervals and procedures for bearings, seals, and valves, including grease type and filling quantities. Also includes repairs/troubleshooting and service information.
- Re-grease or renew roller bearings every 2.5 years or 20,000 operating hours.
- Fill approx. 50% of free space in roller bearings and approx. 65% of adjacent areas with grease.
- Grease type: UNIREX N3 (ESSO Co.) or alternative per DIN 51825-K3N.
- Check rotary seal, V-ring, and valve head for wear and replace if necessary.
- Avoid mixing different grease types.
Key Integration, Operating & Safety Requirements
| Specification / Condition | Engineering Implication | Applies To |
|---|---|---|
| Maximum permissible vibration velocity veff = 4.5 mm/s [0.177 in/s]. p.15 ↗ | Installation must ensure vibration levels stay below this limit to avoid damage; measure at points shown in Fig. 7. | whole series |
| Maximum installation altitude: 1000 m [3280 ft] above sea level. p.15 ↗ | Consult service department if installation altitude exceeds this value. | whole series |
| Tightening torque for piping connections to suction and discharge must not exceed 100 Nm [73.8 ft lbs]. p.16 ↗ | Avoid over-tightening piping to prevent damage to connections. | whole series |
| Intake strainer should be fitted in suction line for the first 100 operating hours. p.16 ↗ | Prevents installation residues from entering the unit during initial operation. | whole series |
| Electrical supply tolerance: ±5% voltage variation and ±2% frequency deviation without loss of performance. p.18 ↗ | Verify power supply quality at installation site. | whole series |
| Minimum air gap between non-insulated energized components and to earth: 5.5 mm [0.217 in] at design voltage UN ≤ 690 V. p.19 ↗ | Ensure terminal box wiring maintains this clearance. | whole series |
| Motor insulation resistance: dry windings if ≤1 kΩ per volt of measurement potential. p.20 ↗ | Check before commissioning to avoid motor failure. | whole series |
| Maximum gas/vapour temperature: +80 °C [176 °F]. p.10 ↗ | For higher temperatures, increase operating-liquid flow to 2.5x (2BV2…) or 2x (2BV5…) design flow or install pre-condenser, and provide guards against burns. | whole series |
| Operating-liquid temperature range: +5 °C to +80 °C, nominal +15 °C. p.10 ↗ | Maintain operating-liquid temperature within limits for proper performance. | whole series |
| Ambient temperature range: +5 °C to +40 °C. p.10 ↗ | Ensure installation environment stays within these limits. | whole series |
| Max discharge pressure for vacuum operation: 1.1 bar abs (2BV2…), 1.3 bar abs (2BV5…). p.10 ↗ | Do not exceed these pressures when design operating-liquid flow is maintained. | 2BV2… and 2BV5… |
| Max permissible internal pressure: 8 bar abs for most types, 6 bar abs for 2BV5410-.F. p.10 ↗ | Install appropriate protection devices if higher pressures can occur in the system. | whole series |
| Design operating-liquid flow for 2BV2060: 0.20 m³/h in all pressure ranges. p.12 ↗ | Set flow limiter accordingly for proper operation. | 2BV2060 |
| First fill quantity of operating liquid: 0.5 L for 2BV206., 1.0 L for 2BV207., 3.0 L for 2BV511., 2BV5121, 2BV5131, 8.0 L for 2BV5161, 2.0 L for 2BV547., 3.0 L for 2BV541., 2BV5421. p.12 ↗ | Use correct quantity when filling before start-up. | specific types |
| Maximum water carry-over through inlet: 2.5x design flow continuous, 7x for max 2 s (2BV2…); 2.5x/5x for 2BV51..; 7x/7x for 2BV5410-.F; 6 m³/h for 2BV541.-1G; 5 m³/h for 2BV542. and 2BV547. p.13 ↗ | Ensure liquid separation prevents exceeding these limits. | specific types |
| Bearing maintenance interval: 2.5 years or 20,000 operating hours. p.28 ↗ | Schedule re-greasing or bearing replacement accordingly. | whole series |
| Grease type: UNIREX N3 (ESSO Co.) or alternative per DIN 51825-K3N; fill approx. 50% of free space in roller bearings and approx. 65% of adjacent areas. p.28 ↗ | Use specified grease and filling quantities; avoid mixing grease types. | whole series |
| Minimum clearances for heat dissipation: 34 mm for 2BV206., 53 mm for 2BV207., 2BV511., 2BV5121, 2BV5131, 2BV54.., 80 mm for 2BV5161. p.8 ↗ | Maintain these clearances around fan guard to prevent overheating. | specific types |
| Maximum speeds with frequency converter: 2BV2060/2061 2636–4612 min-1; 2BV2070/2071 2123–3715 min-1; 2BV5110/5111 1402–2454 min-1; 2BV5121 1290–2258 min-1; 2BV5131 1180–2066 min-1; 2BV5161 913–1597 min-1; 2BV54.. 1402–2454 min-1. p.9 ↗ | Do not exceed these speeds when using frequency converters. | specific types |
| Tightening torques for metal threaded glands: M12x1.5 4–6 Nm, M16x1.5 5–7.5 Nm, M25x1.5 6–9 Nm, M32x1.5 8–12 Nm. p.9 ↗ | Use correct torque when installing cable glands. | whole series |
Faults & Troubleshooting
| Code / Symptom | Possible Cause | Remedy | Note |
|---|---|---|---|
| Motor does not start p.28 ↗ | Electrical power supply failure | Check fuses, terminals and cables for continuity. Repair any break in continuity. | Electrician |
| Motor does not start p.28 ↗ | Impeller does not rotate freely | To free it, rotate the shaft: 2BV2…: Screw in an M8 bolt of sufficient length into the shaft end on the external fan side. Use a wrench to turn the shaft manually. Remove the bolt. 2BV5…: Remove the fan guard. Turn the external fan by hand. Refit the fan guard. | Operator |
| Motor does not start p.28 ↗ | Impeller does not rotate freely (due to calcification) | See "Decalcifying the unit", page 27. | Operator |
| Motor does not start p.28 ↗ | Impeller does not rotate freely (due to foreign matter) | See "Flushing the pump casing", page 27. | Operator |
| Motor does not start p.28 ↗ | Impeller does not rotate freely (clearance issue) | Check the clearance adjustment on the impeller and readjust if necessary. | Service |
| Motor does not start p.28 ↗ | Foreign matter in the unit | Remove the foreign matter. Check that the unit functions correctly. | Service |
| Motor does not start p.28 ↗ | Defective impeller | Replace the impeller. | Service |
| Motor does not start p.28 ↗ | Defective motor bearing | Replace the motor bearing. | Service |
| Circuit breaker trips out again after it has been switched on p.28 ↗ | Short-circuit in the winding | Check the winding. | Electrician |
| Circuit breaker trips out again after it has been switched on p.28 ↗ | Motor overloaded | When operating with supply of the operating-liquid: Check the operating-liquid flow-rate and if necessary reduce it (see chapter 7.4, "Checking and correcting the operating-liquid flow-rate", page 23). | Operator |
| Circuit breaker trips out again after it has been switched on p.28 ↗ | Excessive backpressure in the discharge connection | Reduce the backpressure. | Operator |
| Circuit breaker trips out again after it has been switched on p.28 ↗ | Proportion of liquid entrained in the main flow is too high | Reduce the proportion of liquid. | Operator |